Y
ROUGH ESTIMATE OF THE PRINCIPAL
MATERIALS
REQUIRED FOR CIVIL BUILDINGS.
MATERIALS
UNITS
64
CONDITION "B" & "C"
CONDITION
CONDITION
“E”
HOUSES FOR PING SHAN AIRFIELD
TOTAL
STAGE "A"
TONNAGE
TONNAGE TO BE IMPORTED
TABLE IV.
TONNAGE FROM LOCAL MARKET
Cement
Tous
3,662
7,066
44,166
1,330
56,224
56,800
Mild Steel
56,300
477
1,727
14,797
178
17,179
17,200
Teak
17,200
5,000
7,800
12,542
24,842
Hardwood
24,900
24,900
1,550
3,250
6,271
612
11,683
11,700
Fir Poles
11,700
100 pcs.
438
381
820
41
1,680
Bricks
11,200
11,200
1000 pcs.
1.094
2,384
98,533
1,960
103,971
Tiles
812,000
1000 pcs.
13,736
23,056
1,270
38.062
Lime
76,000
Tons
4.738
5,521
59,956
2.900
73,115
73.100
Glass
73,100
100 sq. ft.
8,278
6,980
11,409
209
26,876
1,800
Electric Wire
1,800
100 yds.
1,967
3,741
6,402
88
12.198
65
Electric Points
Nos,
49,335
70,090
116,210
1,514
237,149
50
Bath
120
671
841
878
2,390
239
Wash Basins
807
1,416
1,718
3,941
100
Water Closet
2,185
5,175
9.935
Sink
17,295
580
715
1,015
993
Cistern
2,723
68
1,220
1,072
1,994
2,764
Pump
5.830
130
1,072
1,994
2,764
" Pipe
5,830
100
100 ft.
1,049
2,084
2,363
55
"G.I. Pipe
5,551
250
665
1.288
2,258
1"
J
4.211
240
1,460
665
1.288
2,258
14"
4,211
370
665
1,288
2.258
4,211
600
N.B. In addition to the above there are numerous smaller stores required,
such as:-
Roofing Telt, Hardware, Builders' Ironmongery, Pipe Fittings, Electric Fittings, Bitumen, Putty, etc., etc., etc.
Hong Kong, 18th February, 1946.
69,600 Tons
517,400 Tons
(Signed) L. W. AMPS,
Lt. Col. R.E.
S.O. I (CA) Works,
Buildings & Lands.
43